/
Key Communications: Hospitals & Critical Access Hospitals

The Joint Commission

Key Communications: Hospitals & Critical Access Hospitals

The following key communications were sent to organization contacts (ORYX and Primary Accreditation Contact listed in an organization’s Joint Commission Connect site) related to ORYX Performance Measurement:

ACCREDITATION

Dear Colleague: .

The Joint Commission is extending the deadline for submission of CY2024 Electronic Clinical Quality Measures (eCQMs) data from March 17, 2025 to April 16, 2025 at 11:59 PM Central Time. This applies to accredited hospitals required or choosing to submit eCQM data for CY2024. 

The 4Q2024 chart-abstracted deadline has not changed; The deadline for submitting 4Q2024 chart-abstracted data to the Joint Commission via the DDSP is March 31, 2025 at 11:59 PM Central Time. 

Please note this email is sent to all organizations regardless of their current submission status within The Joint Commission Direct Data Submission Platform (DDSP).

ADDITIONAL INFORMATION

·     The Joint Commission and CMS are separate entities with separate requirements and platforms; submission of data to one does not meet the requirements of the other.

·     Information on how to verify your organization’s ORYX requirements and data submission is available via the DDSP “Need Help?”: https://jointcommission-ddsp.atlassian.net/wiki/spaces/DCS/pages/106496001

·     Once data submission is complete, download the Submission Report from the Home page on the DDSP, which provides a summary / proof of submission of the data received from your organization.

·     Organizations are responsible for managing user’s access to the DDSP. Staff with access to the DDSP log in via The Joint Commission website: https://www.jointcommission.org/login/

·     CY2024 ORYX Performance Measurement Requirements: https://www.jointcommission.org/measurement/reporting/accreditation-oryx/

·     We strongly encourage organizations to submit their data well in advance of the deadline.

Questions
If you need assistance or have questions with any portion of the Platform, please submit a support ticket via the DDSP “Need Help?” button.
If you have non-DDSP questions, please contact hcooryx@jointcommission.org and include your HCO ID in the subject line.

Thank You    

Dear Colleague: 

This email is sent to all organizations that have ORYX® performance measure reporting requirements regardless of the organization’s current CY2024 data submission status.

 The Joint Commission is reminding organizations that have ORYX® performance measure reporting requirements to submit their data well in advance of upcoming deadlines in order to have time to resolve any unexpected issues and verify that their data is entered accurately and on time. Organizations electing to use consultants or vendors to assist with the data entry process on the DDSP should have their own staff log into the platform to verify that data has been submitted as expected. Joint Commission staff cannot confirm this for you.

Users with access to the DDSP should download and retain the Submission Report from the Home page on the DDSP, which provides a summary / proof of submission of the data received from your organization.

Upcoming Deadlines:

·       The Joint Commission deadline for entering 4Q2024 chart-abstracted data to the DDSP is March 31, 2025 at 11:59PM Central Time.  This is applicable to organizations required or electing to submit chart-abstracted data.

·       The deadline to submit CY2024 eCQM data is March 17, 2025 at 11:59 PM Central Time. The eCQM Submit button is now available in the eCQM Module on the Submit Data page. This is applicable to organizations required or electing to submit eCQMs. 

ADDITIONAL INFORMATION:

·       The Joint Commission and CMS are separate entities with separate requirements and platforms; submission of data to one does not meet the requirements of the other.

·       Visit the ORYX FAQs on the measurement section of the external Joint Commission website, or the Need Help? section on the DDSP for the following information:

o   ORYX Performance Measurement Requirements

o   How to verify your organization’s ORYX requirements and data submission

o   ORYX performance measurement CY2024 and CY2025 timeline

o   Guide for Data Entry of Chart-Abstracted Measures into the DDSP

Questions:
If you need assistance or have questions with any portion of the Platform, please submit a support ticket via the DDSP “Need Help?” button.

If you have non-DDSP questions, please contact hcooryx@jointcommission.org and include your HCO ID in the subject line.

Thank You    

Dear Colleague: 

This email is sent to all organizations that have ORYX® performance measure reporting requirements regardless of the organization’s current CY2024 data submission status.

 The Joint Commission is reminding organizations that have ORYX® performance measure reporting requirements to submit their data well in advance of upcoming deadlines in order to have time to resolve any unexpected issues and verify that their data is entered accurately and on time. Organizations electing to use consultants or vendors to assist with the data entry process on the DDSP should have their own staff log into the platform to verify that data has been submitted as expected. Joint Commission staff cannot confirm this for you.

Users with access to the DDSP should download and retain the Submission Report from the Home page on the DDSP, which provides a summary / proof of submission of the data received from your organization.

Upcoming Deadlines:

·     The Joint Commission deadline for entering 4Q2024 chart-abstracted data to the DDSP is March 31, 2025 at 11:59PM Central Time.  This is applicable to organizations required or electing to submit chart-abstracted data.

·     The deadline to submit CY2024 eCQM data is March 17, 2025 at 11:59 PM Central Time. The eCQM Submit button is now available in the eCQM Module on the Submit Data page. This is applicable to organizations required or electing to submit eCQMs. 

ADDITIONAL INFORMATION:

·     The Joint Commission and CMS are separate entities with separate requirements and platforms; submission of data to one does not meet the requirements of the other.

·     Visit the ORYX FAQs on the measurement section of the external Joint Commission website, or the Need Help? section on the DDSP for the following information:

o  ORYX Performance Measurement Requirements

o  How to verify your organization’s ORYX requirements and data submission

o  ORYX performance measurement CY2024 and CY2025 timeline

o  Guide for Data Entry of Chart-Abstracted Measures into the DDSP

Questions:
If you need assistance or have questions with any portion of the Platform, please submit a support ticket via the DDSP “Need Help?” button.

If you have non-DDSP questions, please contact hcooryx@jointcommission.org and include your HCO ID in the subject line.

Thank You  

Dear Colleague: 

This is a reminder for those organizations required or electing to submit 3Q2024 chart-abstracted data to The Joint Commission. Please note this email is sent to all organizations regardless of their current submission status within The Joint Commission Direct Data Submission Platform (DDSP).

The deadline for submitting 3Q2024 chart-abstracted data to the Joint Commission via the DDSP is December 31, 2024 at 11:59 PM Central Time. We strongly encourage organizations to submit their data well in advance of the deadline.

CY2024 ORYX Performance Measurement Timeline

  • 1Q 2024 (Jan, Feb, Mar) Chart-abstracted measures: DDSP opened February 1, 2024; deadline to enter data was June 30, 2024

  • 2Q 2024 (Apr, May, Jun) Chart-abstracted measures: DDSP opened May 1, 2024; deadline to enter data was September 30, 2024

  • 3Q 2024 (Jul, Aug, Sep) Chart-abstracted measures: DDSP opened August 1, 2024 and data must be entered by December 31, 2024

  • 4Q 2024 (Oct, Nov, Dec) Chart-abstracted measures: DDSP opened November 1, 2024 and data must be entered by March 31, 2025

  • CY2024 eCQMs: DDSP opened August 5, 2024; Transmission period to submit data opens January 1, 2025, and data must be submitted by March 17, 2025

The ORYX Performance Measurement Timeline for CY2024 data submission is available via the DDSP “Need Help?” and ORYX FAQs; quick link: 
https://jointcommission-ddsp.atlassian.net/wiki/spaces/DCS/pages/71008257  

Deadline for retransmission of 4Q2023 CAM Data
If your organization identified incorrectly entered or incorrectly omitted chart-abstracted data for 4Q2023, the deadline to correct this is December 31, 2024 at 11:59 PM Central Time. There will be no opportunity to resolve 4Q2023 CAM data beyond this date.

Information on Retransmission is available via the DDSP “Need Help?” and ORYX FAQs; quick link: 
https://jointcommission-ddsp.atlassian.net/wiki/spaces/DCS/pages/141295632

ORYX Performance Measurement Requirements
Requirements for CY2024 and CY2025 are available on our website:
https://www.jointcommission.org/measurement/reporting/accreditation-oryx/

Questions
If you need assistance or have questions with any portion of the DDSP, please submit a support ticket via the DDSP “Need Help?” button.

If you have non-DDSP questions, please contact hcooryx@jointcommission.org and include your HCO ID in the subject line.

Thank You  

Dear Colleague:

The Specifications Manual for Joint Commission National Quality Measures, Addendum Version 2025A1 (applicable starting with 1/1/2025 encounters) and associated Release Notes have been posted to the Wiki Joint Commission Specifications Manual and the Joint Commission website.
 
The Version 2025A1 manual contains the following changes:

  • VTE-6 is being retired effective 1/1/2025

Please share this information with relevant staff in your organization and if applicable with your vendor.

Questions?
Please contact https://manual.jointcommission.org  
Thank you 

 

 

Dear Colleague: 

This communication is to correct an error on Slide #89 from the 9/10/2024 Office Hours. The slide stated that eCQM patient-level data submitted to the DDSP will be removed six months after the close of the eCQM submission period. However, sub-bullet #3 incorrectly stated that “QI page graphs and results table view… will continue to display.” The correct information is that the data associated with the graphs on the QI page and the results table view will not be available after the patient-level data has been removed from the DDSP. 

Historical HCO-level aggregate eCQM data is included in the DDSP’s Data Submission Report. This report is available on the Home page of the DDSP and documents the hospital’s data submission for the year. 

Hospitals wishing to retain the DDSP-generated eCQM patient-level data results must download them from the DDSP Quality Improvement page before six months after the close of the eCQM submission period. The patient-level results can be downloaded using the “Review Patient Results” button on the Quality Improvement page. For CY2023 data, the deadline to download is September 30, 2024. 

Corrected 9/10/2024 Office Hour Slide #89: 
Slide #89 Office Hours (corrected)
Thank you 

Dear Colleague:

The Specifications Manual for Joint Commission National Quality Measures, Addendum Version 2024B1 (applicable starting with 10/1/2024 encounters) and associated Release Notes have been posted to the Wiki Joint Commission Specifications Manual website and the Joint Commission website

The Version 2024B1 manual contains the following changes:

  • Appendix A Terminology Updates including ICD-10 Changes

Please share this information with relevant staff in your organization and if applicable with your vendor.

Questions?
Please contact https://manual.jointcommission.org  
Thank you 

Dear Colleague: 

The Specifications Manual for Joint Commission National Quality Measures, version 2025A (applicable starting with 1/1/2025 encounters) and associated Release Notes have been posted to the Wiki Joint Commission Specifications Manual website and the Joint Commission website.
 
The 2025A Specifications Manual contains the following changes:

  • The use of Gestational Age code tables in PC-01 and PC-02 has been removed from the 2025A manual since the intent of the measures is to capture the gestational age at time of delivery.

  • The PDF version of the manual is not being published due to 508 Compliance issues.  As an alternative option, users can PDF each section of the web version by clicking on the ellipsis in the browser menu, then click Print and select Adobe PDF.

See Release Notes for details on all of the changes to this version of the Specifications Manual.

Please share this information with relevant staff in your organization and if applicable with your vendor.

Questions?
Please contact https://manual.jointcommission.org  
Thank you 

Dear Colleague: 

This is a reminder for those organizations required or electing to submit 2Q2024 chart-abstracted data to The Joint Commission. Please note this email is sent to all organizations regardless of organization’s current submission status within The Joint Commission Direct Data Submission Platform (DDSP).

The Joint Commission deadline for submitting 2Q2024 chart-abstracted data to the DDSP is September 30, 2024 at 11:59 PM Central Time. We strongly encourage organizations to submit their data well in advance of the deadline.

CY2024 ORYX Performance Measurement Timeline

  • 1Q 2024 (Jan, Feb, Mar) Chart-abstracted measures: DDSP opens February 1, 2024 and data must be entered by June 30, 2024

  • 2Q 2024 (Apr, May, Jun) Chart-abstracted measures: DDSP opens May 1, 2024 and data must be entered by September 30, 2024

  • 3Q 2024 (Jul, Aug, Sep) Chart-abstracted measures: DDSP opens August 1, 2024 and data must be entered by December 31, 2024

  • 4Q 2024 (Oct, Nov, Dec) Chart-abstracted measures: DDSP opens November 1, 2024 and data must be entered by March 31, 2025

  • CY2024 eCQMs: DDSP opens August 5, 2024; Transmission period to submit data opens January 1, 2025, and data must be submitted by March 17, 2025

The ORYX Performance Measurement Timeline for CY2024 data submission is available via the DDSP “Need Help?” and ORYX FAQs; quick link: 
https://jointcommission-ddsp.atlassian.net/wiki/spaces/DCS/pages/71008257  

Deadline for retransmission of 3Q2023 CAM Data
If your organization identified incorrectly entered or incorrectly omitted chart-abstracted data for 3Q2023, the deadline to correct this is September 30, 2024 at 11:59 PM Central Time. Therewill be no opportunity to resolve 3Q2023 CAM data beyond this date.

Information on Retransmission is available via the DDSP “Need Help?” and ORYX FAQs; quick link: 
https://jointcommission-ddsp.atlassian.net/wiki/spaces/DCS/pages/141295632

CY2024 ORYX Performance Measurement Requirements
Requirements for CY2024 are available on our website:
https://www.jointcommission.org/measurement/reporting/accreditation-oryx/

Questions
If you need assistance or have questions with any portion of the DDSP, please submit a support ticket via the DDSP “Need Help?” button.

If you have non-DDSP questions, please contact hcooryx@jointcommission.org and include your HCO ID in the subject line.  
Thank you 

The Joint Commission will be hosting office hours for the Direct Data Submission Platform (DDSP) on Tuesday, September 10, 2024 from 11am - 12:00pm (Central Time). The Direct Data Submission Platform (DDSP) is used for submission of required ORYX Performance Measurement data.  

Office hours are a webinar-based format.  The content of the webinar for office hours includes tips for successful use of the platform and data submission. The webinar is staffed by The Joint Commission staff to answer questions for HCOs. Attendees can ask questions via the Ask a Question feature. 
  
Please register for the September 10th session using this link: 
https://goto.webcasts.com/starthere.jsp?ei=1652170&tp_key=54b581baec

Each participant should register individually, as the sign on link provided after registration is specific to each registrant. Please forward this link to any staff or consultants participating in ORYX Performance Measurement and/or data submission to the DDSP who may benefit from the content in these webinars.   

Office hours are recorded. The recording will be available via the same registration link and recordings are also available on the DDSP via the “Need Help?” link, “Education Learning Resources”.

The proposed agenda for the September 10th webinar is:

  • Overview of CY2024 platform updates

We recommend users new to ORYX and/or the DDSP review the available platform demonstration videos and supporting documentation in advance of Office Hours. These are available via the DDSP “Need Help?” / Learning & Resources link within the platform and available here:
DDSP Platform Demo Videos

Questions Regarding Office Hours   
Contact hcooryx@jointcommission.org and in the email subject line include DDS Participant and HCO ID. 
  
Thank you 

Dear Colleague:

The Direct Data Submission Platform (DDSP) CY2024 eCQM module is now available.  

From August 5, 2024 to December 31, 2024: Users are able to upload, review, purge and re-upload eCQM data.   

From January 1, 2025 to March 17, 2025: Users are able to submit eCQM data. 

The deadline to submit CY2024 eCQMs is March 17, 2025. 

We strongly encourage HCOs to submit well in advance of the deadline in order to have time to resolve any unexpected issues.  

Organizations required or electing to submit eCQMs to The Joint Commission must submit all four quarters of CY2024 data to meet 2024 ORYX requirements.  

Resources:
Accessing the Direct Data Submission Platform (DDSP)
Existing users access the DDSP via the Joint Commission Website “Login” button:https://www.jointcommission.org/

eCQM Known Issues List:
https://jointcommission-ddsp.atlassian.net/wiki/spaces/DCS/pages/86114305/Known+Issues+eCQM

ORYX Performance Measurement Requirements:
https://jointcommission-ddsp.atlassian.net/wiki/spaces/DCS/pages/403472385

ORYX Performance Measurement Timeline (important dates for CY2024 data submission):
https://jointcommission-ddsp.atlassian.net/wiki/spaces/DCS/pages/71008257

ORYX Frequently Asked Questions:
https://jointcommission-ddsp.atlassian.net/wiki/spaces/DCS/pages/1966081

Information on how to use the DDSP is available via the “Need Help?” link within the platform, or via the left-hand table of contents when accessing any of the above links.

Questions
If you need assistance or have questions with any portion of the Platform, please submit a support ticket via the DDSP “Need Help?” link. 

If you have non-DDSP questions, please contact hcooryx@jointcommission.org and include your HCO ID in the subject line. 

Thank you

Dear Colleague:

This is a reminder for those organizations required or electing to submit 1Q2024 chart-abstracted data to The Joint Commission. Please note this email is sent to all organizations regardless of organization’s current submission status within The Joint Commission Direct Data Submission Platform (DDSP).

The Joint Commission deadline for submitting 1Q2024 chart-abstracted data to the DDSP is June 30, 2024 at 11:59 PM Central Time. We strongly encourage organizations to submit their data well in advance of the deadline.

CY2024 ORYX Performance Measurement Timeline

  • 1Q 2024 (Jan, Feb, Mar): DDSP opens February 1, 2024 and data must be entered by June 30, 2024

  • 2Q 2024 (Apr, May, Jun): DDSP opens May 1, 2024 and data must be entered by September 30, 2024

  • 3Q 2024 (Jul, Aug, Sep): DDSP opens August 1, 2024 and data must be entered by December 31, 2024

  • 4Q 2024 (Oct, Nov, Dec): DDSP opens November 1, 2024 and data must be entered by March 31, 2025

The ORYX Performance Measurement Timeline for CY2024 data submission is available via the DDSP “Need Help?” and ORYX FAQs – quick link: 
https://jointcommission-ddsp.atlassian.net/wiki/spaces/DCS/pages/71008257  

CY2024 Extenuating Circumstances
If your organization intends to submit an Extenuating Circumstances Request (ECR) form specific to submitting eCQM data for CY2024, all forms must be received at The Joint Commission no later than June 1, 2024. If no eCQMs will be submitted, organizations are required to submit a minimum of three (3) chart-abstracted measures for the entire calendar year, unless the request is for an exception for submission of any data and supporting documentation is provided.

Information on ECR’s are available via the DDSP “Need Help?” and ORYX FAQs – quick link: 
https://jointcommission-ddsp.atlassian.net/wiki/spaces/DCS/pages/74088449/Extenuating+Circumstances

CY2024 ORYX Performance Measurement Requirements
Requirements for CY2024 are available on our website:
https://www.jointcommission.org/measurement/reporting/accreditation-oryx/

Questions
If you need assistance or have questions with any portion of the DDSP, please submit a support ticket via the DDSP “Need Help?” button.

If you have non-DDSP questions, please contact hcooryx@jointcommission.org and include your HCO ID in the subject line.

Thank you

In April The Joint Commission will send an e-mail to acute care hospitals with information
about joining the National Healthcare Safety Network (NHSN) Group. The e-mail will be sent
to the primary accreditation contact and/or the ORYX® contact listed on the organization’s
secure Joint Commission Connect® extranet site.


The January 2024 issue of Perspectives announced that, beginning July 1, 2024, acute
care hospitals with ORYX performance measurement requirements that have to participate
in the NHSN system through a US Centers for Medicare & Medicaid Services (CMS) program,
must join the Joint Commission NHSN Group. Participation in the Joint Commission NHSN
Group is optional for critical access hospitals where participation in CMS programs is not
required.

Sign-Up Milestones and Troubleshooting

The following table provides the timeline of sign-up tasks.

April 2024

Hospitals will receive a survey via e-mail to indicate their appointed
NHSN facility administrator and provide contact information for that
individual. This survey should be completed no later than April 29,
2024.

April 2024

Hospitals will receive a survey via e-mail to indicate their appointed
NHSN facility administrator and provide contact information for that
individual. This survey should be completed no later than April 29,
2024.

May 2024

An e-mail with NHSN Group joining instructions will be sent to the
designated NHSN facility administrator; instructions also will be posted
on the hospital’s Joint Commission Connect extranet site or the ORYX
Performance Measurement Resources page.

May–June 2024

Hospitals will join the Joint Commission NHSN group and accept the
Confer Rights Template within the NHSN site: https://www.cdc.gov/nhsn/pdfs/groups-startup/templatesetup_ps-current.pdf

July 1, 2024

Enrollment in the Joint Commission NHSN Group must be complete.


Please note that health care organizations that filter e-mails must whitelist* all e-mail from
the @jointcommission.org domain to ensure that they receive all communications from The
Joint Commission. Specifically, communication from the following must be accepted:


Organization contacts that do not receive the e-mail about joining the Joint Commission
NHSN Group by the second week in April 2024 should check junk/spam/clutter folders and/
or work with internal information technology staff to verify the e-mail is not blocked by a
firewall. Contact the ORYX Help Line if these troubleshooting suggestions fail to locate the
e-mail; please remember to provide your health care organization (HCO) identification (ID)
number in the e-mail

*A whitelist is a list of e-mail addresses or domain names from which an e-mail–blocking program will allow messages to be received. E-mail–
blocking programs, also called spam filters, are intended to prevent most unsolicited e-mail messages (spam) from appearing in subscriber inboxes.
If you are uncertain how your HCO handles whitelisting, please contact your internal information technology staff.

Dear Colleague:

This is a reminder for those organizations required or electing to submit eCQM data to The Joint Commission to meet their CY2023 ORYX requirements. Please note this email is sent to all organizations regardless of organization’s current submission status within The Joint Commission Direct Data Submission Platform (DDSP).

The Joint Commission deadline for submitting CY2023 eCQM data to the DDSP is March 15, 2024 at 11:59 PM Central Time. We strongly encourage organizations to submit their data well in advance of the deadline.

It is important for organizations to verify that their data is processed and submitted accurately and on time and retain a copy of their Submission Report. Organizations electing to use consultants or vendors to assist with the data submission process on the DDSP should have their own staff log into the platform to verify that data has been submitted as expected. Joint Commission staff cannot confirm this for you.

ADDITIONAL INFORMATION

Questions
If you need assistance or have questions with any portion of the Platform, please submit a support ticket via the DDSP “Need Help?” button.

If you have non-DDSP questions, please contact hcooryx@jointcommission.org and include your HCO ID in the subject line.

Thank you
 

Dear Colleague, 

The purpose of this communication is to inform you that the Joint Commission will be deleting CY2022 QRDA-I files from the DDSP servers effective 4/12/2024.  

Once the CY2022 QRDA-I files have been removed from the DDSP, users will not be able to view patient level data in the Source Viewer and Logic Explorer debugging tools accessible via the magnifier icon. In addition, the magnifier icon on the Upload Data - Upload Summary page will not function. 

This will not affect DDSP users’ ability to view/download their CY2022 Data Submission Reports from the Home page, Patient Result detail report on the Quality Improvement page, or Error and Warning report on the Data Accuracy page.   In addition, there is no impact to submitted data saved in the DDSP database. 

Hospitals that would like to review their CY2022 eCQM data in Source Viewer or Logic Explorer for debugging purposes need to act before Friday, April 12, 2024. 

Please note, moving forward, QRDA-I files for each annual submission will be removed 6 months after close of the submission period. Therefore, 2023 QRDA-I files will be removed in September 2024. 

Note that the 2021 QRDA-I Files have already been removed and while the DDSP debugging tools to review these files cannot be used anymore, however, the Patient Result detail reports, Error and Warning reports, Data Submission Reports, and the dashboard views are available.  

If you have any questions, please submit a support ticket via the “Need Help?” button on the DDSP. 

Thank you 

Dear Colleague:

This is a reminder for all DDSP users. This email is sent to all organizations currently active on The Joint Commission Direct Data Submission Platform (DDSP), and regardless of the organization’s current submission status. Information on whether this applies to your organization and how to verify your organization’s ORYX requirements and submission status is provided below.  

Applicable to organizations required or electing to submit chart-abstracted data: The Joint Commission deadline for entering 4Q2023 chart-abstracted data to the DDSP is March 31, 2024 at 11:59 PM Central Time.

Applicable to organizations required or electing to submit eCQMs: The eCQM Submit button is now available in the eCQM Module on the Submit Data page.  The deadline to submit  of CY2023 eCQM data is March 15, 2024 at 11:59 PM Central Time.   

We strongly encourage organizations to enter or submit their data well in advance of the deadline. It is important for organizations to verify that their data is entered/submitted accurately and on time. Joint Commission staff cannot confirm this for you. Organizations electing to use consultants or vendors to assist with the data entry process on the DDSP should have their own staff log into the platform to verify that chart-abstracted data has been entered as expected. 
 
ADDITIONAL INFORMATION 

Questions 
If you need assistance or have questions with any portion of the Platform, please submit a support ticket via the DDSP “Need Help?” button. 
 
If you have non-DDSP questions, please contact hcooryx@jointcommission.org and include your HCO ID in the subject line.  
 
Thank you 

Dear Colleague: 

This is a correction specifically applicable to Critical Access Hospitals regarding the CY2024 ORYX Performance Measurement Requirements. 

Correction: Participation in the Joint Commission National Healthcare Safety Network (NHSN) Group is optional for Critical Access Hospitals where participation in CMS programs is not required. 

Please note onboarding information to opt-in to The Joint Commission NHSN Group will be provided to all organizations, including Critical Access Hospitals, in CY2024. Critical Access Hospitals may elect to participate in The Joint Commission NHSN Group if they choose. 

For information regarding The Joint Commission CY2024 ORYX requirements, please see the CY2024 requirements document posted on The Joint Commission website: https://www.jointcommission.org/measurement/reporting/accreditation-oryx/  

QUESTIONS  
If you have questions, please contact hcooryx@jointcommission.org and include your HCO ID in the subject line.  
 
Thank You 

Dear Colleague: 

The Joint Commission updated the CY2024 ORYX® Performance Measure reporting requirements effective January 1, 2024. These updates affect reporting requirements for Joint Commission–accredited critical access hospitals and hospitals.

Key 2024 updates include the following:

  • Effective January 1, 2024, The Joint Commission is implementing a new decision rule applicable to hospitals and critical access hospitals with ORYX performance measurement requirements, to reinforce the requirement to participate in the ORYX performance measurement initiative. Organizations may receive a Denial of Accreditation if they fail to meet ORYX performance measure reporting requirements for two consecutive years in the absence of receipt of an approved extenuating circumstance request from The Joint Commission. See Key Communications for additional information.

  • Acute care hospitals and critical access hospitals will be required to join the Joint Commission National Healthcare Safety Network (NHSN) Group. Information on the process to join The Joint Commission NSHN group will be distributed during late 2023 and early 2024. See the November Perspectives® article for additional information.

  • Two new electronic clinical quality measures (eCQMs) will be available to meet ORYX eCQM submission requirements.

    • Hospital-Harm—Opioid Related Adverse Events eCQM (HH-ORAE)

    • Global Malnutrition Composite Score eCQM (GMCS)

  • Two new chart-abstracted measures will be available to meet ORYX measure submission requirements:

    • Screening for Social Drivers of Health (SDOH-1)

    • Screen Positive Rate for Social Drivers of Health (SDOH-2)

  • The Joint Commission will retire four measures beginning January 1, 2024:

    • Chart-abstracted Hospital-Based Inpatient Psychiatric Services - Multiple Antipsychotic Medications at Discharge with Appropriate Justification (HBIPS-5)

    • Chart-abstracted Tobacco Treatment Measures - Tobacco Use Treatment Provided or Offered (TOB-2) and Tobacco Use Treatment (TOB-2a)

    • eCQM Emergency Department (ED) - Admit Decision Time to ED Departure Time for Admitted Patients (eED-2)

    • eCQM Stroke - Discharged on Statin Medication (eSTK-6) [Note: the chart-abstracted STK-6 measure remains required for applicable Stroke certification programs]

  • Applicable to [Large] Hospitals (HAP) with ≥26 Licensed beds OR ≥50,000 Outpatient visits AND Provide Obstetrical Services:

    • Perinatal Care (PC) requirements will no longer be based on annual live birth volume; PC requirements apply to [Large] Hospitals (HAP) that provide obstetrical services.

Please review the detailed list of all requirements and measures by organization type for CY2024 via The Joint Commission’s ORYX Performance Measurement Reporting page.

Specifications for Joint Commission chart-abstracted measures are available on Specification section of The Joint Commission’s ORYX Performance Measurement page.

Specifications for eCQMs are available on the Electronic Clinical Quality Improvement (eCQI) Resource Center website.

Questions regarding these updates and requirements may be directed to the ORYX Help Inbox. Please include your HCO ID # in the subject line of all inquiries.

Thank You

Dear Colleague,

 

Effective January 1, 2024, The Joint Commission is implementing a new decision rule for critical access hospitals and hospitals to reinforce the requirement to participate in the ORYX® performance measurement initiative. The ORYX initiative is an integral part of Joint Commission accreditation. Compliance with the initiative supports an organization’s continuous quality improvement efforts by monitoring key performance areas.

Annual ORYX performance measure reporting is required by Accreditation Participation Requirement (APR) Standard APR.04.01.01, Element of Performance (EP) 24. With the new decision rule, organizations may receive a Denial of Accreditation (DA) if they fail to meet ORYX performance measure reporting requirements for two consecutive years.

DA07: The hospital has failed to meet ORYX performance measurement requirements for two consecutive years in the absence of an approved Extenuating Circumstance from The Joint Commission.

Beginning with calendar year (CY) 2024 ORYX performance measurement data, if an accredited organization does not submit performance measures for a calendar year, it will receive a notification that it either needs an approved Extenuating Circumstance Request (ECR) for the year or to submit performance measures. If the organization still has not submitted performance measures at the close of a second calendar year, it may receive a Denial of Accreditation, regardless of where the organization is in its accreditation cycle. Organizations experiencing emergency or disaster incidents, changes to their electronic health record systems, or other circumstances that create a significant burden for quality reporting may request an exemption for the ORYX reporting requirements by completing and returning The Joint Commission ECR form available within the ORYX FAQs or via the DDSP “Need Help?”.

Additional information on the Joint Commission’s ECR process and submission deadlines are available in the ORYX FAQs repository. The Joint Commission’s ECR process differs from the US Centers for Medicare & Medicaid Services’ (CMS) exemption request process, so it is important to review the ORYX FAQs prior to established deadlines.

The decision rule will be published in the fall 2023 E-dition update to the Comprehensive Accreditation Manual for Critical Access Hospitals (CAMCAH) and the Comprehensive Accreditation Manual for Hospitals (CAMH). For those who purchase them, the 2024 hard-copy CAMCAH and CAMH will include the new decision rule.

For more information and a detailed list of all requirements and measures, visit The Joint Commission’s ORYX Performance Measurement Reporting page. The Joint Commission will post additional 2024 ORYX reporting requirements in a future issue of Perspectives. Questions regarding the new decision rule may be directed via email to hcooryx@jointcommission.org.

 

Thank you

 

Dear Colleague:   

If you are receiving this communication, your organization has CY2023 ORYX Performance Measurement Requirements to submit chart-abstracted and/or eCQM data to The Joint Commission via the Direct Data Submission Platform (DDSP).

The DDSP chart-abstracted measure (CAM) module opens 12:00 pm Central Time on July 31, 2023.  

  • The CAM module will open for 1Q and 2Q data entry on July 31, 2023

    • The deadline to submit 1Q and 2Q CAM data has been extended to December 31, 2023.

  • The CAM module will open for 3Q data entry on September 1, 2023

    • The deadline to submit 3Q CAM data is December 31, 2023

  • The CAM module will open for 4Q data entry on November 1, 2023

    • The deadline to submit 4Q CAM data is March 31, 2024

  • The CY2023 eCQM module will open September 1, 2023

    • The deadline to submit CY2023 eCQMs is March 15, 2024

Additional information regarding the ORYX Performance Measurement Timeline (including important dates for CY2023 data submission) is available on the “Measurement” section of the external Joint Commission website under “Supporting Materials”:

https://www.jointcommission.org/measurement/resources/

 

Additional Information:
Existing DDSP users access the platform via the Joint Commission Website “Login” button: https://www.jointcommission.org/login/  

ORYX Performance Measurement Requirements:
https://www.jointcommission.org/measurement/reporting/accreditation-oryx/

 

ORYX Frequently Asked Questions:

https://www.jointcommission.org/measurement/oryx-faqs/

Recorded on-demand “How to” demo videos available within the DDSP via the Need Help? button under “Education Learning Resources > "How To" Demo Videos : https://jointcommission-ddsp.atlassian.net/wiki/spaces/DCS/pages/7602177

 

Office Hours for eCQMs and Chart-Abstracted Measures
The Joint Commission continues to offer DDSP Office Hours. Office Hours are a webinar format, with the ability to ask questions via the chat function. The content of the webinars for Office Hours includes tips for successful use of the platform and submission of data.  The webinar is staffed by Joint Commission staff to answer questions. Prior Office Hours webinars are recorded and available via the DDSP “Need Help” link via the “Education Learning Resources” tab.
 

Questions
If you need assistance or have questions with any portion of the Platform, please submit a support ticket via the DDSP “Need Help?” link.

If you have non-DDSP questions, please contact : hcooryx@jointcommission.org and include your HCO ID in the subject line. 

Thank you

 

Dear Colleague:

The Direct Data Submission Platform for submission of CY2022 eCQM and/or chart-abstracted data is delayed and will be available by late January 2023.

A notification will be provided when the platform becomes available.

If you have any questions in advance of this deadline, please submit a support ticket via the “Need Help?” button on the DDSP or e-mail hcooryx@jointcommission.org.

Thank you

 

Dear Colleague:

The Direct Data Submission Platform (DDSP) Electronic Clinical Quality Measure (eCQM) module opens at 12:00 pm Central Time on October 3, 2022 for CY2021 data submission. This communication is applicable to organizations required or electing to submit CY2021 eCQM data to The Joint Commission.

The deadline to submit CY2021 eCQM data is December 31, 2022.

Accessing the Direct Data Submission Platform (DDSP) Existing users access the DDSP via the Joint Commission Website “Login” button: https://www.jointcommission.org/

For new users, please look for your invitation email, which contains the link to the DDSP. The organization’s DDSP security administrator must grant access to the eCQM Module from Invite and Manage Users (link is on the left hand menu).

  • Once on the DDSP, if you have any questions, please submit a support ticket via the 'Need Help?' button

  • Multi-factor Authentication to access the DDSP is required. Please review the guidance documentation for MFA available here:

Certain eCQM functionalities will not be available for the October 3 “go live”, however, application functionalities will be added over time. When these features become available you will be notified by the Important Updates section of the Home Page. Users can upload and review measure results at this time, but the Submit functionality and Submit Report is not yet available and will be accessible with the coming releases before the CY2021 deadline. The eCQM known issues list is provided on the DDSP under “Need Help?”.

Additional Information:

Please review ORYX requirements via our website: https://www.jointcommission.org/measurement/reporting/accreditation-oryx/

Timeline

Please see the ORYX Performance Measurement timeline on our website under “Supporting Materials” for important dates for CY2022 data submission.

Office Hours for eCQMs and Chart-Abstracted Measures

The Joint Commission continues to offer DDSP Office Hours. Office Hours are a webinar format, with the ability to ask questions via the chat function. The content of the webinars for Office Hours includes tips for successful use of the platform and submission of data. The webinar is staffed by Joint Commission staff to answer questions.

Thank you

Sent September 21, 2022

Dear Colleague:

The Joint Commission updated the 2023 ORYX® Performance Measure reporting requirements effective January 1, 2023. These updates affect reporting requirements for Joint Commission–accredited critical access hospitals and hospitals. Key updates include:

  • 3 New eCQMs will be available to meet ORYX eCQMs submission requirements:

    • Hospital Harm - Severe Hypoglycemia Measure

    • Hospital Harm - Severe Hyperglycemia Measure

    • Appropriate Treatment for ST-Segment Elevation Myocardial Infarction (STEMI) Patients in the Emergency Department (ED)

  • Hospitals that are required or elect to submit eCQMs are required to submit eCQM data on a minimum of four (4) eCQMs for all four quarters starting with 2023 discharges

  • The Joint Commission will retire chart-abstracted HBIPS-1

Additionally, CMS and The Joint Commission will both include maternal care eCQMs ePC-02 and ePC-07 as optional measures for the 2023 measure collection year. The Joint Commission made these measures available as optional measures to satisfy 2022 ORYX Performance Measure requirements. Specifications for the 3 new eCQMs as well as ePC-02 and ePC-07 are available on the eCQI Resource Center.

For more information and a detailed list of all requirements and measures, visit The Joint Commission’s Performance Measurement page. Questions may be directed to hcooryx@jointcommcommission.org.

Thank You

Sent August 1, 2022

Update: The Joint Commission’s New Direct Data Submission Platform

ORYX® Measure Submission Timelines Established

On July 5, 2022, The Joint Commission’s in-house Direct Data Submission Platform (DDSP) onboarding began for organizations to accept their initial invitation to access the new platform (see the June 2022 issue of Perspectives for additional information related to the new DDSP). The following timelines provide the dates health care organizations are required to report their ORYX® performance measures.

Calendar Year (CY) 2021 Data Submission Timeline

  • July 5–8, 2022: Initial invitations were sent to organizations’ Signatory Authority for onboarding to the new platform.

  • August 1, 2022: DDSP chart-abstracted measure module opens, allowing health care organizations to enter their remaining CY2021 chart-abstracted measure data.

  • October 3, 2022: DDSP electronic clinical quality measure (eCQM) module opens, allowing health care organizations to upload and submit their CY2021 eCQM data.

  • December 31, 2022: Deadline to submit CY2021 chart-abstracted measure and eCQM data.

 

Calendar Year 2022 Data Submission Timeline

  • January 2, 2023: DDSP chart-abstracted measure and eCQM modules open to allow healthcare organizations to enter CY2022 chart-abstracted measure data and upload and submit eCQM data.

  • March 15, 2023: Deadline to submit CY2022 eCQM data.

  • April 30, 2023: Deadline to submit CY2022 chart-abstracted measure data.

 

Calendar Year 2023 Data Submission Timeline

  • May 2023: DDSP available for CY2023 data submission of 1Q2023 chart abstracted measure data and CY2023 eCQM data.

 

Additional Resources:

Health care organizations can visit the Measurement Resources page under “Supporting Materials” on The Joint Commission’s website for additional information, including important opening dates, data submission deadlines, and upcoming webinars. In addition, the recording, slides, and transcript are available on the Pioneers in Quality® General Sessions page for the Joint Commission’s Direct Data Submission Platform informational webinar that was held in June.

For more information and a detailed list of all ORYX requirements and measures, visit the Performance Measurement page on The Joint Commission’s external website.

Thank you

Dear Colleague,


The Joint Commission has been working to develop in-house capability for performance
measurement data submission. To accelerate this work, we are contracting with Dynamic
Health IT (DHIT) to support the development of a new Direct Data Submission Platform
(DDSP) and electronic clinical quality measure (eCQM) engine.


The DDSP will enable the submission of quality measurement data directly to The Joint
Commission from the approximately 3,500 accredited critical access hospitals and hospitals
that are required to submit this data to meet accreditation requirements. The DDSP will also
provide accredited hospitals with near real-time eCQM performance data.


DHIT will develop the platform underpinning the DDSP and apply its CQMsolution® – an
Office of the National Coordinator for Health Information Technology (ONC) certified Clinical
Quality Language measure engine – to calculate, display and generate eCQMs. The Joint
Commission will develop the chart-abstracted measure (CAM) engine and provide HCO
support.


The new platform will be available in the second half of 2022. Accredited organizations
familiar with The Joint Commission’s previous DDSP will note few changes to the look and
feel of the new platform. We look forward to unveiling the new platform to continue to enable
chart-abstracted and eCQM measure submission.


While the platform is under development, ORYX® performance measurement requirements
are not suspended. Hospitals must continue to collect and aggregate their ORYX data
consistent with the Specifications Manual for Joint Commission National Quality Measures
and the Joint Commission Guide for Data Entry of Chart-Abstracted Measures. In addition,
organizations must continue to trend their ORYX measurement data for performance
improvement and, if applicable, be prepared to provide this data during survey.


A save the date for an introductory webinar about the platform will be sent in May and the
on-boarding process is anticipated to begin in June. A detailed timeline for all webinars, and
deadlines for CY2021 and CY2022 data submission will be provided in mid-2022.
Organizations also will be able to access on-demand online education throughout the launch
of the platform.

 

As a reminder, the data submission timeline and DDSP delay does not affect data submitted
for certification programs via the Certification Measure Information Process (CMIP) tool on
The Joint Commission Connect® extranet site. There are no changes to the certification data
submission timelines for 2021 or 2022. In addition, this delay does not affect the hospitals’
measurement requirements for data submission to the Centers for Medicare & Medicaid
Services (CMS).


For more information and a detailed list of all ORYX requirements and measures, visit The
Joint Commission website.


Questions? Please contact hcooryx@jointcommission.org.

Thank you

CERTIFICATION

 

Pending

 

Related content

©The Joint Commission, All Rights Reserved
The Joint Commission is a registered trademark of The Joint Commission.